institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Repowering: Double Photovoltaic Power on the Same Surfaces

Summary by Pv Magazine Deutschland
The Pfalzwerke and the Stadtwerke Neustadt are renewing a photovoltaic open space system, which ran out of EEG funding at the end of 2024. In the future, the solar park at Lilienthal airfield will have an output of 4.5 megawatts and thus more than twice as much as the predecessor system from 2003.The Pfalzwerke and the Stadtwerke Neustadt modernise a photovoltaic open space system at Lilienthal airfield in Neustadt. It dates from 2003 and was at…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

All
Left
Center
Right

The Pfalzwerke and the Stadtwerke Neustadt are renewing a photovoltaic open space system, which ran out of EEG funding at the end of 2024. In the future, the solar park at Lilienthal airfield will have an output of 4.5 megawatts and thus more than twice as much as the predecessor system from 2003.The Pfalzwerke and the Stadtwerke Neustadt modernise a photovoltaic open space system at Lilienthal airfield in Neustadt. It dates from 2003 and was at…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

pv magazine Deutschland broke the news in on Friday, July 4, 2025.
Sources are mostly out of (0)