Published • loading... • Updated
Region: Marine on the Starting Line
Summary by lemoniteur.fr
1 Articles
1 Articles
The christening of the Marine Tunneler on 24 September kicked off the work carried out in design and construction on the Grand Paris Express site. The engine will launch in mid-October of the Agnès well in Aubervilliers (Seine-Saint-Denis) towards the Niemen-Normandie in Bobigny (Seine-Saint-Denis), which it is expected to reach at the end of 2027 after a race of 5.5 km. This first section of the line 15 east (23 km) which will connect Saint-Den…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium