Short Conduction Break Red Line of the Lisbon Metro Between Chelas and Airport
4 Articles
4 Articles
The accumulation of water in the tunnels caused the immobilization of a composition and led several passengers to abandon the carriage and to walk along the tracks, forcing the company to cut the energy and temporarily suspend the service throughout the line.
A small flood in the technical rooms led to the partial cut of the Red Line. Passengers trapped in immobilized train forced doors and left for the track, forcing them to cut off all the traffic.
Line became completely cut by precaution. Circulation is only done between San Sebastião and Chelas
Circula o na Linha Reda do Metro de Lisboa has been cut since 17:22 this day due to a break in a gua line.
Coverage Details
Bias Distribution
- 50% of the sources are Center, 50% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium




