Published • loading... • Updated
Rang Saint-Placide Sud: Major Work on Two Bridges
Summary by Le Charlevoisien
1 Articles
1 Articles
Nearly $600,000 will be invested on two bridges located on the Saint-Placid South Range in Baie-Saint-Paul. The decks of the bridges across the Moulin Creek and the Rivière-à-Idas will be completely replaced. A total of 10 bids were submitted in a recent bid from the Department of Transport and Sustainable Mobility (MTMD) for the construction of the site. These are the Randard Constructions Inc. of Dury, a municipality in the Estrie region, on t…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
