Proposed route for MR-C Transmission Project coming in 2026 - New York Mills Dispatch
2 Articles
2 Articles
Proposed route for MR-C Transmission Project coming in 2026 - Frazee-Vergas Forum
High-voltage lines expected to run through southern Becker County By Robert Williams Editor Minnesota Power, Otter Tail Power Company, and Great River Energy are currently gathering information from the public to support the development of potential routes for the Maple River- Cuyana (MR-C) Transmission Project. Details of the project are to construct a new, approximately 160-mile-long, single-circuit...
Proposed route for MR-C Transmission Project coming in 2026 - New York Mills Dispatch
High-voltage lines expected to run through part of Otter Tail County By Robert Williams Editor Minnesota Power, Otter Tail Power Company, and Great River Energy are currently gathering information from the public to support the development of potential routes for the Maple River- Cuyana (MR-C) Transmission Project. Details of the project are to construct a new, approximately...
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium