Published • loading... • Updated
Premier Energies Commissions 5.6GW Solar Module Facility in Telangana
2 Articles
2 Articles
Premier Energies commissions 5.6 GW solar module facility in Telangana
Premier Energies Ltd has commenced trial production at its 5.6 GW solar module manufacturing facility in Seetharampur, Telangana. The new facility produces G12R TOPCon modules with zero busbar (0BB) architecture.Premier Energies Ltd has commenced trial production at its 5.6 GW solar module manufacturing facility in Seetharampur, Telangana. The new facility produces G12R TOPCon modules with zero busbar (0BB) architecture. With this addition, the …
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

