Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Pipera Metro Will Extend to Petracani. Metrorex Plans for Magistrala 2

Summary by Digi 24
Metrorex announces that Magistrala 2 metres will be extended east, on the Pipera - Petricans throne, and for this purpose it has been signed, a co-operation protocol between the Ministry of Transport and Company. The new section will include two metro stations, with modern facilities and interconnected with surface transport. According to Metrorex representatives, the investment is a strategy, in the context of rapid growth of the Pipera-Tunari …

6 Articles

Center

Metrorex announces that Magistrala 2 metres will be extended east, on the Pipera - Petricans throne, and for this purpose it has been signed, a co-operation protocol between the Ministry of Transport and Company. The new section will include two metro stations, with modern facilities and interconnected with surface transport. According to Metrorex representatives, the investment is a strategy, in the context of rapid growth of the Pipera-Tunari …

·Romania
Read Full Article
Lean Left

The Berceni 2 metric discipline – Pipera, or the "corporate discipline" as it is called the metric line that ensures the connection to the Aviation-Pipera cartel where there are numerous office buildings, will be extended by two...

·Romania
Read Full Article

The project is intended to build a section about 1.6 km from the double road, on the Boulevard Dimitrie Pompeiu and Petricani Street, until the intersection with Bulevardud Pipera

·Bucharest, Romania
Read Full Article

At the headquarters of the Ministry of Transport and Infrastructure, the co-operation protocol was signed for the launch of the two-metre Magistral extension project on the Pipera – Petricani throne.

·Bucharest, Romania
Read Full Article

The documentation for the extension of the M2 metro line has been signed, on the Pipera-Petricani section. The project envisages the extension of the line by 1.6 km of double track, including two modern stations. The cost is estimated at 120 million euros excluding VAT, announces the City Hall of Sector 2. "Good news for the residents of Sector 2! The M2 metro line will be extended with two more stations, […] The post M2 metro line will be exten…

The Pipera-Petricani metro line, an extension of the Tudor Arghezi-Pipera Main Line 2, will be built by the City Hall of Sector 2. "Today, together with Rareș Hopincă, the mayor of Sector 2, and Mariana Miclăuș, general director of Metrorex, I signed the collaboration protocol between the Ministry of Transport and Infrastructure, the City Hall of Sector 2, and Metrorex for the extension of Main Line 2, on the Pipera-Petricani section. The projec…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left, 50% of the sources are Center
50% Center

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Club Feroviar broke the news in on Tuesday, September 2, 2025.
Sources are mostly out of (0)

Similar News Topics

News
For You
Search
BlindspotLocal