3 Articles
3 Articles


Peterborough Wastewater Plant partially bypasses secondary treatment amid heavy rain
The Peterborough Wastewater Treatment Plant is currently experiencing a partial bypass, with some partially treated effluent being discharged into the Otonabee River following primary treatment and disinfection. The bypass is a result of extreme wet conditions that have led to significantly higher-than-normal water flows. The volume of wastewater entering the system has exceeded the plant’s capacity, prompting the need to divert some flow past t…
Coverage Details
Bias Distribution
- 100% of the sources lean Left
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage