Published • loading... • Updated
Park City School District narrative on Superfund site water discharge undercut by permits, emails, and city records
Summary by TownLift, Park City News
1 Articles
1 Articles
Park City School District narrative on Superfund site water discharge undercut by permits, emails, and city records
PARK CITY, Utah — It has been nine weeks since a Park City School District (PCSD) contractor called the Utah Department of Environmental Quality (DEQ) spills hotline in early October to report that groundwater had been discharged directly into a ditch on the eastern side of the Treasure Mountain Junior High construction site. The site sits within a Superfund area linked to historic mining contamination. Certified lab tests collected from the sit…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
