Oriole Resources extends the sub-surface gold system at Mbe project
Summary by African Mining Market
1 Articles
1 Articles
Oriole Resources extends the sub-surface gold system at Mbe project
Oriole Resources PLC has confirmed that drilling at its Mbe project in Cameroon has extended the sub-surface gold system, with recent results pointing to a strike length of at least 300 metres and mineralisation open in all directions and at depth. The London-listed explorer reported that recent holes from its maiden drilling programme at the MB01-S …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium