Published • loading... • Updated
Nextpower Enters Multi-Year Gigawatt-Scale Steel Frame Supply Agreement with Jinko Solar (U.S.) Industries Inc. for Advanced Solar Modules
Summary by Green Stock News
3 Articles
3 Articles
Nextpower to supply steel frames to Jinko's US panel assembly operations
Nextpower has entered into a multi-year steel frame supply agreement with Jinko Solar (U.S.) Industries. Nextpower will supply more than 1 GW of steel frames, scalable to up to 3 GW over a three-year period, to support module manufacturing in Jinko Solar’s Jacksonville, Florida, facility, with production expected mid-2026. For developers, U.S.-made steel frames add 6%… The post Nextpower to supply steel frames to Jinko’s US panel assembly operat…
Coverage Details
Total News Sources3
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium


