New Specific Drought Protocol for Montevideo and Minas - Diario La R
Summary by grupormultimedio.com
1 Articles
1 Articles
SBI noted that a technical report contracted in 2024, funded by the Inter-American Development Bank (IDB) and delivered in June 2025 “was conclusive: the Casupá dam is a more robust and reliable solution than Arazati to ensure drinking water in the metropolitan area in the face of future droughts.” The study, supervised by the National Water Directorate (Dinagua) and OSE, compared both structural alternatives to a growing demand scenario around …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium