institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

New Solar System at Kurt-Masur-Schule: City Already Produces over 2,300 Megawatt Hours of Electricity on Municipal Roofs · Leipziger Zeitung

Summary by L-iz.de
The city of Leipzig currently produces around 2,300 megawatt hours of green electricity per year on municipal roofs. This corresponds to the average annual consumption of 1,000 single-person households. In recent years, 38 new photovoltaic systems have been newly built on urban buildings, while in 2025 another 15 plants are under construction and in preparation, reports the Department of Urban Development and Construction. A visible [...] The ar…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

All
Left
Center
Right

The city of Leipzig currently produces around 2,300 megawatt hours of green electricity per year on municipal roofs. This corresponds to the average annual consumption of 1,000 single-person households. In recent years, 38 new photovoltaic systems have been newly built on urban buildings, while in 2025 another 15 plants are under construction and in preparation, reports the Department of Urban Development and Construction. A visible [...] The ar…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

l-iz.de broke the news in on Saturday, June 14, 2025.
Sources are mostly out of (0)