Published • loading... • Updated
New school, same site: Board backs feasibility study for $72M CMS replacement on existing site
Summary by MyEasternShoreMD
1 Articles
1 Articles
New school, same site: Board backs feasibility study for $72M CMS replacement on existing site
CENTREVILLE — Plans to replace Centreville Middle School moved forward March 4 after the Queen Anne’s County Board of Education approved a feasibility study recommending construction of a new school on the existing site.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium
