Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

New Road Champions Ried i.o.: Functional and Fit for the Future

Summary by Land Tirol
2.9 million euros for modern infrastructureRoad Master's Office Ried i. O. responsible for 150 km of road safety for 150 km of road: The new road master's Office Ried in the Oberinntal (Landeck district) was completed after approximately one and a half years of construction. The modern two-storey administration building with desk roof was built with a focus on sustainability. A photovoltaic system as well as electric filling stations for state v…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

2.9 million euros for modern infrastructureRoad Master's Office Ried i. O. responsible for 150 km of road safety for 150 km of road: The new road master's Office Ried in the Oberinntal (Landeck district) was completed after approximately one and a half years of construction. The modern two-storey administration building with desk roof was built with a focus on sustainability. A photovoltaic system as well as electric filling stations for state v…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Land Tirol broke the news in on Wednesday, August 13, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal