Published • loading... • Updated
New Hwy 1 overpass complete at Tank Hill, site of 2021 storm damage (BC)
Summary by castanet.net
2 Articles
2 Articles
New Hwy 1 overpass complete at Tank Hill, site of 2021 storm damage (BC)
A new overpass has been opened on Highway 1 at Tank Hill, north of Lytton. The overpass has restored grade separation between the highway and the railway for the first time since the 2021 atmospheric river. That storm completely washed out the highway and rail bridge. Temporary repairs resulted in a...
·Kelowna, Canada
Read Full ArticleCoverage Details
Total News Sources2
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium
