Published • loading... • Updated
New Finish at Suceava "șTefan Cel Mare" International Airport
Summary by Ziar De Suceava
1 Articles
1 Articles
The tender procedure for the design and execution of Terminal 3 at the “Ștefan cel Mare” Suceava International Airport was launched today. A terminal of almost 11,000 square meters, three times larger than the two existing terminals combined. The estimated value of the design and execution contract is approximately 167.5 million lei, excluding VAT (approximately 33 million euros). The winner of the tender will have 24 months to execute the contr…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
