Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

New Finish at Suceava "șTefan Cel Mare" International Airport

Summary by Ziar De Suceava
The tender procedure for the design and execution of Terminal 3 at the “Ștefan cel Mare” Suceava International Airport was launched today. A terminal of almost 11,000 square meters, three times larger than the two existing terminals combined. The estimated value of the design and execution contract is approximately 167.5 million lei, excluding VAT (approximately 33 million euros). The winner of the tender will have 24 months to execute the contr…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.Cross Cancel Icon

1 Articles

The tender procedure for the design and execution of Terminal 3 at the “Ștefan cel Mare” Suceava International Airport was launched today. A terminal of almost 11,000 square meters, three times larger than the two existing terminals combined. The estimated value of the design and execution contract is approximately 167.5 million lei, excluding VAT (approximately 33 million euros). The winner of the tender will have 24 months to execute the contr…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Ziar de Suceava broke the news in on Thursday, March 5, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal