institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Mumbai’s Elphinstone Bridge to close for traffic for two years from April 10

Summary by The Hindu
The Elphinstone bridge, which is set to be dismantled, is 13 metres wide and currently accommodates only 1.5 lanes of traffic in each direction. The closure might cause traffic congestion and disruptions, especially in Dadar, Lower Parel, Curry Road and Bharatmata areas of central Mumbai.

5 Articles

All
Left
1
Center
Right
1
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left, 50% of the sources lean Right
50% Right
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

The Hindu broke the news in India on Wednesday, April 9, 2025.
Sources are mostly out of (0)

Similar News Topics