Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published • loading... • Updated

First Steel Bridge Launched in Maharashtra for Mumbai-Ahmedabad Bullet Train Project

NHSRCL said the 100-metre, 1,405-tonne span is one of 28 steel bridges planned along the corridor.

  • On Monday, NHSRCL successfully launched the first steel bridge for the Mumbai-Ahmedabad Bullet Train Project in Maharashtra, crossing the Nashik Highway at Dive-Anjur in Bhiwandi.
  • The Mumbai-Ahmedabad Bullet Train project requires 28 steel bridges across major infrastructure corridors; to date, 16 have been completed, with structures designed for highway and expressway crossings.
  • Fabricated in Trichy, Tamil Nadu, approximately 1,300 km away, the bridge weighs 1,405 tonnes and measures 14 metres in height and width, featuring protective painting and elastomeric bearings for durability.
  • Assembly used 22 skid arrangements and 54,076 Tor-Shear Type High Strength Bolts on temporary trestles at approximately 17.5 metres, with the operation conducted during night traffic blocks to minimize National Highway disruptions.
  • Reflecting the vision of Make in India, the project demonstrates indigenous technical and material capabilities, showcasing Indian industry's growing ability to manufacture complex infrastructure for technologically advanced rail projects.
Insights by Ground AI

16 Articles

Lean Right

In the Mumbai-Ahmedabad bullet train project, the pace of construction seems to be accelerating on the Maharashtra side as well. Maharashtra's first steel bridge for this project has been installed in Bhiwandi of Thane. 100 meters long and weighing 1,405 metric tonnes, this bridge has been installed on National Highway-3.

DevdiscourseDevdiscourse
+5 Reposted by 5 other sources
Center

First steel bridge launched in Maharashtra for Mumbai-Ahmedabad bullet train project

A 100-metre-long steel bridge weighing 1,405 MT has been launched over NH-3 at Dive-Anjur village in Bhiwandi, Maharashtra, for the Mumbai-Ahmedabad Bullet Train Project.

·India
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 75% of the sources lean Right
75% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Indian Express broke the news in Noida, India on Monday, September 28, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal