You are connecting from Lake Geneva Public Library, please login or register to take advantage of your institution's Ground News Plan.
Published 2 hours ago • loading... • Updated 2 hours ago
MITE * MINISTRY OF ENVIRONMENT AND ENERGY SAFETY * "VALUTATION ENVIRONMENT IMPACT (PNIEC-PNRR): PROJECT OF TWO AGRICULTURAL EQUIPMENT, DENOMINATED "BRIDGE A" AND "BRIDGE B," RESPECTIVELY OF THE POWER OF 6,324 MWP AND 5,636 MWP, AND OF THE RELEVANT WORKS OF CONNECTION TO THE DISTRIBUTION NETWORK MT WITH TENS" - Journalistic Agency Opinion. News From Italy - World / Trentino South Tyrol
Summary
Concluded with "positive" outcome (D.M. MASE_VA_DEC_2026-0000616 of 07/10/026) the Environmental Impact Assessment procedure (PNIEC-PNRR) inherent to the project "Project of two agrivoltaic plants, called "BRINDISI A" and "BRINDISI B," respectively of the power of 6,324 MWp and 5,636 MWp, and of the relative works of connection to the distribution network MT with nominal voltage of 20 kV, to be realized in the municipality of Brindisi (BR)."
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Concluded with "positive" result (determination MASE_2026-0207441 of 06/10/026) the procedure of single measure in environmental matter (PNIEC-PNRR) inherent to the project "Project of an agrivoltaic plant called "Morrone" of peak power equal to 49,01 MW and related works of connection to the RTN, in the municipalities of San Martino in Pensilis (CB) and Larino (CB)."