institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Metrovia Reactive Feeding Route Plaza Dañín From This July 26th

Summary by El Universo
Guayaquil will have, again, the feeding route Plaza Dañín. From this Saturday, July 26, the Metrovia System resumes the operation of this route, part of Troncal 2: July 25 – Rio Daule.

1 Articles

Lean Right

Guayaquil will have, again, the feeding route Plaza Dañín. From this Saturday, July 26, the Metrovia System resumes the operation of this route, part of Troncal 2: July 25 – Rio Daule.

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

El Universo broke the news in on Saturday, July 26, 2025.
Sources are mostly out of (0)

You have read 1 out of your 5 free daily articles.