Mayor of montería Maintain Continuous Pumping in Collector Juan Xxiii–El Dorado
2 Articles
2 Articles
Montería, February 16, 2026. The mayor reported progress in stabilizing the drainage and sewerage system on the left bank of Montería, after several days of pressure on the network due to the winter emergency. Although the most critical points are under control, the pumping of the matrix collector that connects Juan XXIII with El Dorado continues on a permanent basis. The work is carried out in coordination with the intervention of the channel, …
The Mayor of Montería advances in the recovery of the drainage and sewerage system on the left bank, one of the areas most hit by the recent winter emergency. According to Mayor Hugo Kerguelén García, the critical points are controlled, although the permanent pumping of the matrix collector that connects Juan XXIII with El Dorado continues to alleviate the accumulated pressure. The EBAR La Ribera station remains operational and the contingency l…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

