Massive wind turbine planned to tower over Pembrokeshire countryside set for refusal
Council officers say the 76-metre turbine application lacks required bat survey data and does not meet planning policy, despite no landscape objections.
6 Articles
6 Articles
Massive wind turbine planned to tower over Pembrokeshire countryside set for refusal
Wind turbine application which was previously withdrawn late last year over a lack of information on how it may affect bats is expected to be turned down
Fresh setback for wind turbine scheme as bat concerns remain
Wind turbine. Bruce Sinclair, Local Democracy Reporter A call for a five month breathing space for a wind turbine application, which was previously withdrawn late last year over a lack of information on how it may affect bats, is expected to be turned down and the scheme refused. In December of last year, in an application recommended for refusal at Pembrokeshire County Council’s planning committee, Constantine Wind Energy Ltd sought permission …
Sageston wind turbine plan hits a snag
A call for a five month breathing space for a wind turbine application for Sageston which was previously withdrawn late last year over a lack of information on how it may affect bats, is expected to be turned down and the scheme refused.
Sageston 76-metre tall wind turbine set to be refused
A CALL for a five month breathing space for a wind turbine application which was previously withdrawn late last year over a lack of information on how it may affect bats, is expected to be turned down and the scheme refused. In December of last year, in an application recommended for refusal at Pembrokeshire County Council’s planning committee, Constantine Wind Energy Ltd sought permission for a 76-metre-high wind turbine at Summerton Farm, Sage…
Coverage Details
Bias Distribution
- 100% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium


