'Explain Ghost Projects': Marcos Tells Discaya-Linked Firm
4 Articles
4 Articles
Marcos to St. Timothy Construction: Explain incomplete, substandard flood control project in Bulacan
President Ferdinand Marcos Jr. on Friday said he would summon St. Timothy Construction to explain why a flood control structure in Bulacan remained incomplete a
Photo from RTVM President Ferdinand “Bongbong” Marcos, Jr. is disappointed with what he saw in a flood control project in Calumpit, Bulacan. During the President’s visit with Transportation Secretary Vince Dizon and Governor Daniel Fernando to the River Protection Structure in Barangay Bulusan of the said town on Friday, August 15, it was learned that the project that would have helped alleviate flooding was not completed. “More than 200 meters …
Coverage Details
Bias Distribution
- 67% of the sources lean Left
Factuality
To view factuality data please Upgrade to Premium