Published • loading... • Updated
LOADSHEDDING HOURS REDUCING DUE TO INCREASED WATER LEVELS IN KAFUE RIVER
Summary by The Zambian Observer
1 Articles
1 Articles
LOADSHEDDING HOURS REDUCING DUE TO INCREASED WATER LEVELS IN KAFUE RIVER
Load shedding has ‘miraculously’ reduced due to increased water in Kafue – Nalumango VICE President Mutale Nalumango says the miraculous reduction in load shedding hours in some areas is due to natural causes such as the increased water levels in the Kafue River. The Vice President said this in the National Assembly this morning in […] The post LOADSHEDDING HOURS REDUCING DUE TO INCREASED WATER LEVELS IN KAFUE RIVER first appeared on The Zambian…
·Zambia
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
