Library board balks at city request to use library reserve funds to start a $1.9 million roof repair - Evanston RoundTable
Summary by Evanston RoundTable
1 Articles
1 Articles
Library board balks at city request to use library reserve funds to start a $1.9 million roof repair - Evanston RoundTable
Members of the Evanston Public Library Board have been in talks off and on with the city for years about repairing a leaky roof at the main library, 1703 Orrington Ave. At a meeting last week, though, trustees joined Executive Director Yolande Wilburn, emphatically rejecting the city’s suggestion the library pledge its reserve balance fund to get the $1.9 million project off the ground. “We’re not doing our fiduciary responsibility to drain our …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium