ASI Urged to Complete Puri Jagannath Temple Ratna Bhandar Repair Work During Rath Yatra - OrissaPOST
3 Articles
3 Articles
ASI urged to complete Puri Jagannath temple Ratna Bhandar repair work during Rath Yatra - OrissaPOST
Bhubaneswar: The authorities of the Jagannath temple in Puri have urged the ASI to complete repair work in the Ratna Bhandar (treasury) of the shrine in Puri during the coming Rath Yatra festival, when the deities will be in another temple for nine days. The Archaeological Survey of India (ASI), the custodian of the 12th-century temple, began repairing the Ratna Bhandar in July 2024 when it was reopened after 46 years. In a letter, Shree Jaganna…
SJTA Urges ASI To Fast Track Ratna Bhandar Work Of Puri Temple During Rath Yatra
Bhubaneswar: Chief Administrator of Shree Jagannath Temple Administration (SJTA), Arvind Padhee, has written to the ASI Director General Yadubir Singh Rawat, urging swift completion of Ratna Bhandar repair work of the 12th-century shrine during Rath Yatra (June 28 – July 6). The ASI began repairing the revered treasury of the Lords in July 2024 when it was reopened after 46 years. The temple administration also informed the ASI that the agency’s…
By Our Correspondent PURI: The Chief Administrator of the temple, Dr. Arvind Kumar Padhi, has written a letter to the Director General of ASI (Archaeology Department of India) to expedite the repair and conservation work of the Ratnabhandar. The Chief Administrator has mentioned in the letter that the remaining work of the Ratnabhandar should be expedited and completed quickly during the upcoming Rath Yatra (June 28 to July 6). He has asked to …
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium