The water supply system of the city will be affected due to leakage in the main pipeline of 1200 mm diameter Narmada supply on Rajendra Nagar Main Road in Indore. To repair the leakage in the pipeline, all the pumps of the first and second phase of Narmada Water Supply Project had to be shut down on Monday afternoon. After the repair work was completed, the pumps were restarted at around 10 pm, but due to the period of pumps being shut down, 20 …
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The water supply system of the city will be affected due to leakage in the main pipeline of 1200 mm diameter Narmada supply on Rajendra Nagar Main Road in Indore. To repair the leakage in the pipeline, all the pumps of the first and second phase of Narmada Water Supply Project had to be shut down on Monday afternoon. After the repair work was completed, the pumps were restarted at around 10 pm, but due to the period of pumps being shut down, 20 …