Published • loading... • Updated
Lane Closures Set for Tyrone Boulevard Pavement Project
Summary by IONTB
1 Articles
1 Articles
Lane Closures Set for Tyrone Boulevard Pavement Project
ST. PETERSBURG — Lane closures will begin at 6 a.m. Friday, February 20, on Tyrone Boulevard (Alt U.S. 19) between 73rd Street North and 68th Street North. The closures will be in place in both directions around the clock for approximately 10 days, weather permitting. One lane will remain open in each direction. The temporary closures are required for paving operations and guardrail installation as part of the Alt U.S. 19 pavement rehabilitation…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

