Landslide Blocks Prithvi Highway in Dhading
5 Articles
5 Articles
Nepal Flash Flood: The troubles of the people in Nepal are not stopping. Due to continuous rain, an alert has been issued for the people living in the riverside areas. Due to the road caving in in the Krishnabhir area, the Muglin-Kathmandu road has been stopped. The post Road caving in in Nepal, adjacent to Bihar, Muglin-Kathmandu road closed, high alert due to the danger of floods and landslides appeared first on Prabhat Khabar.
Kathmandu. The Kathmandu-Muglin road has been completely blocked due to floods. Traffic movement in both directions has been completely stopped after the road was washed away at Krishnabhir. It is said that the road was blocked after the flood in Trishuli cut off the road from below. The road has been partially washed away after the flood cut off. The road, which was blocked for some time this morning, was completely closed in a short time […] T…
Prithivi Highway in full operation - Peoples' Review
Kathmandu, August 30: Traffic that had been halted on the Prithivi Highway highway has resumed following information that the Bhote Koshi River had flooded again. Earlier in the morning, all vehicular movement to and from Pokhara and Kathmandu via Narayangadh and Muglin was halted after reports that the water level in the Bhote Koshi River […] The post Prithivi Highway in full operation appeared first on Peoples' Review.
Traffic on the highway, which was halted after reports of renewed flooding in the Bhotekoshi River, has resumed operations.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium







