Published • loading... • Updated
Lake Mitchell dam fails flood standard, city eyes variance to move ahead with dredge work
Summary by The Daily Republic
1 Articles
1 Articles
Lake Mitchell dam fails flood standard, city eyes variance to move ahead with dredge work
MITCHELL — Lake Mitchell’s water retention capacity is not up to current standard, and officials are hopeful for a state waiver to be able to take on their dredging project. Mitchell Mayor Jordan Hanson issued a statement on Monday that the Lake Mitchell earthen dam and spillway cannot safely pass a 50% Probably Maximum Flood (PMF), which is a requirement for reservoirs the size of Lake Mitchell. The finding is the result of a recent study of La…
·Fairfield, United States
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right1Center0Last UpdatedBias Distribution100% Right
Bias Distribution
- 100% of the sources lean Right
100% Right
R 100%
Factuality
To view factuality data please Upgrade to Premium

