Konecranes Wins 34-Crane Electric Terminal Order
3 Articles
3 Articles
APM Terminals Elizabeth orders RTG cranes from Konecranes
APM Terminals Elizabeth has signed an agreement with Konecranes for 34 fully electric Rubber-Tired Gantry cranes, with an option for six additional units, as part of a broader modernisation programme at one of North America’s busiest container terminals. The order was booked in the second quarter of 2026, with deliveries to be completed by the end of 2028. The E-RTGs are fully powered by onboard battery packs and will be deployed across the term…
Konecranes wins 34-crane electric terminal order
Konecranes will supply 34 battery-electric rubber-tyred gantry cranes to APM Terminals Elizabeth in the Port of New York and New Jersey, with an option covering six further machines. Deliveries are scheduled in stages through the end of 2028 as the terminal increases yard capacity and replaces more of its container-handling equipment with electrically powered systems. The order was booked during the second quarter of 2026 and covers E-RTGs using…
The orders will be delivered to the port by the end of 2028.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium








