Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Jr Central Unveils "Linear River Bridge" for the First Time - Progress? Construction Is Underway in Yamanashi Prefecture, and Discussions Are Underway for the Shizuoka Section as Well

Summary by toyokeizai.net
The Linear Chuo Shinkansen, which JR Central is currently constructing between Shinagawa and Nagoya, will primarily travel at high speeds in tunnels dug deep underground, with some sections appearing above ground. The route within Yamanashi Prefecture will cover about 30% of the entire route, covering a distance of 27.1 km.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

The Linear Chuo Shinkansen, which JR Central is currently constructing between Shinagawa and Nagoya, will primarily travel at high speeds in tunnels dug deep underground, with some sections appearing above ground. The route within Yamanashi Prefecture will cover about 30% of the entire route, covering a distance of 27.1 km.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

toyokeizai.net broke the news in on Sunday, August 24, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal