Ivory Coast: Implementation of New Oil Logistics Infrastructure with a Capacity of 100,700 M3
2 Articles
2 Articles
On 24 July 2026, the Société de gestion des stocks pétroles de Côte d'Ivoire (GESTOCI) inaugurated in Yamoussoukro a new 20,000 m3 tank of diesel fuel and the first Ivorian loading post at the source of the tankers, aimed at strengthening national storage capacities and improving the supply of petroleum products.
On 24 July 2026 in Yamoussoukro, the Minister of Mines, Petroleum and Energy, Mamadou Sangafowa-Coulibaly, inaugurated a new R14 ferry of 20,000 m3 for the storage of diesel fuel, as well as a loading station in source of the GESTOCI. According to the officials of the sector, this entry into service carries the nominal capacity of...
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

