"It's Unnecessary and We Don't Want It": Residents Stand up to Mat Escatró-La Secuita with a Mobilization in Reus
2 Articles
2 Articles
Entities and platforms opposed to the Red Eléctrica very high voltage line project are waiting to receive the response to the allegations presented
Entities and platforms opposed to the Aragon-Catalonia Very High Voltage (MAT) line project have called for a united demonstration in Reus (Baix Camp) today to reject the plan to connect the substation in the Aragonese municipality of Escatró with La Secuita (Tarragonès). The project, which was already rejected more than a decade ago due to a shape defect, plans to repower the current power line along about 200 kilometers, going from the current…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

