Itapu Set up in Renewable Energy and Wants to Double Capacity
Summary by Globo
1 Articles
1 Articles
Photovoltaic plates in the bed of the tank, green hydrogen extraction in Parquetec and biogas generation are already taking place within the binary company
·Brazil
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium