Published • loading... • Updated
In Chile Begins the Commercial Operation Andes Solar Iii, 171 Mw and Bess 171 Mw / 513 Mwh
Summary by Pv-Magazine-latam.com
1 Articles
1 Articles
This is the new stage of the Hub Andes Solar, in Antofagasta. According to the company AES Chile, the complex reaches 692 MW photovoltaics and 510 MW of storage, exceeds 1.3 billion dollars of accumulated investment and is the largest in Latin America in its type. AES Andes announced the start of the commercial operation of Andes Solar III, a hybrid plant located in the region of Antofagasta that adds 171 MW of installed solar capacity and a sto…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
