Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Hungary to Sink Barges, Build Weir to Save Nuclear Plant

Officials say the emergency river works could lift water levels by up to 1 meter and prevent a full shutdown of Hungary’s only nuclear plant.

  • On Wednesday, Prime Minister Péter Magyar announced authorities are building a riverbed sill and positioning 80-metre barges near the Paks Nuclear Power Plant to raise Danube River water levels and secure cooling capacity.
  • Persistent drought and heatwaves drove the Danube to record lows, forcing Paks to operate at around 10% capacity and threatening the facility's 44-year history of uninterrupted power generation.
  • Prime Minister Magyar stated the intervention costs around 6 billion forints, far below the 50 billion forints monthly economic losses if operations ceased, justifying rapid deployment.
  • Following a 19-centimetre rise in Danube levels, Paks began restarting a turbine on Monday, increasing output from 240 megawatts to 500 megawatts under strict technical and safety conditions.
  • Officials warned the water level rise remains temporary, prompting the government to review Paks 2 expansion and diversify energy supplies by tendering 700 megawatts of wind power capacity by August 31.
Insights by Ground AI

86 Articles

Center

In the face of the drought, Hungarian Prime Minister Peter Magyar announced the launch of construction works to raise the level of the river and ensure the cooling of the Paks nuclear power plant, which now operates at only 25% of its capacity.

·France
Read Full Article
Lean Right

In the early days of August, the Danube level fell to historical lows due to drought and heat waves, forcing seven of the plant’s eight turbines to stop

·Madrid, Spain
Read Full Article

Hungary wants to raise the low Danube level with a hollow threshold. The military should start immediately to secure the cooling of the nuclear reactors in Paks again.

·Frankfurt, Germany
Read Full Article
Lean Left

"After 16 years of idly watching our land dry up, they are now lecturing about delays," Hungarian Prime Minister Peter Magyar announced on his platform X account, alluding to the country's energy situation due to a heat wave that lowered the level of the Danube.

·Belgrade, Serbia
Read Full Article
Lean Left

The government of Prime Minister Péter Magyar has ordered the construction of a weir in the Danube riverbed to slow down the flow and raise the level of the river, which is used to cool the reactors of the Paks nuclear power plant. The government also has an emergency solution in the form of two tugboats loaded with rocks that can be sunk in the Danube if necessary, thereby raising the level of the river.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 40% of the sources lean Left
40% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

24 HU broke the news in Budapest, Hungary on Sunday, August 9, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal