Published • loading... • Updated
Highway 97 to close during avalanche control work
Summary by Energetic City
1 Articles
1 Articles
Highway 97 to close during avalanche control work
Highway 97 will be closed for approximately one hour on March 13th due to avalanche control work. (file) CHETWYND, B.C. — Highway 97 will be closed for approximately one hour today due to avalanche control work. According to Drive BC, the highway connecting Chetwynd to Prince George will be closed for approximately one hour between 11 a.m. and 3 p.m., between Kloss Road and Old Hasler Road for 44.4 kilometres. The closure is located three kilom…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

