High-grade depth extension at Jericho copper project
Summary by iQ Industry Queensland
1 Articles
1 Articles
All
Left
Center
Right
High-grade depth extension at Jericho copper project
A step-out drilling program has confirmed high-grade copper mineralisation continuing several hundred metres below the current inferred resources at AIC Mines’ Jericho project. AIC has released results from the program, including a 5.5m intercept grading 2.4 per cent copper and 4m at 4.1 per cent copper. Two widely spaced holes tested down-plunge of the project’s […] Thank-you for your interest in iQ Industry Queensland. We invite you t…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium