institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Herat launches 220-megawatt wind project for energy independence

Summary by The Frontier Post
HERAT (TOLOnews): A 220-megawatt wind power project, costing nearly 70 million dollars, was inaugurated in Herat with the presence of Mullah Abdul Ghani Baradar, the deputy prime minister for economic affairs. The project is planned to be implemented in several phases, with the first phase having a production capacity of over 40 megawatts. At the inauguration ceremony, the deputy prime minister for economic affairs stated that this project marks…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

3 Articles

All
Left
Center
Right

The first phase of a 43.2 megawatt wind power project in Herat province was inaugurated by Taliban officials. At the same time, work on a five megawatt solar power project has also begun in Herat. The Taliban’s Deputy Prime Minister for Economic Affairs said that $64 million will be invested in the wind power project and $3.5 million in the solar power project by the private sector and the Afghan Electricity Company. Abdul Ghani Baradar, the Tal…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

روزنامه اطلاعات روز broke the news in on Saturday, May 31, 2025.
Sources are mostly out of (0)