Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published • loading... • Updated

Greenvolt Secures 284 Million for 253 MW Wind Farm in Romania

Summary by Sapo
One of the largest wind projects in the country, in Gurbannești, goes into operation until the end of 2027, announces Greenvolt.

7 Articles

Lean Left

One of the largest wind projects in the country, in Gurbannești, goes into operation until the end of 2027, announces Greenvolt.

·Lisboa, Portugal
Read Full Article
Lean Left

The Portuguese Greenvolt Group, fully controlled by the US investment fund KKR, has obtained a funding of EUR 284 million for the construction of a 253.1 MW wind farm in Calăraşi County. The project will have 42 turbines and would become operational by the end of 2027. Read more on StartupCafe..

·Romania
Read Full Article

Greenvolt Group announces that, through Greenvolt Power, one of the leaders of the development segment of wind, solar and energy storage projects in large-scale batteries, has obtained a funding of 284 million eruo for the 253.1 MW wind project in Gurbănești, Calăraşi County.

The financing of the two Wind Rose parks totals EUR 632 million. The transaction with ENGIE will end at the entry into operation of the park in Ialomița.

·Romania
Read Full Article

Greenvolt Group, through Greenvolt Power, a developer of wind, solar and energy storage projects in large-scale batteries, has obtained a financing of 284 million euros for the 253.1 MW wind project in Gurbanești, located east of Bucharest, Romania. The project, one of the largest [...]

Forbes EspañaForbes España
Reposted by
elperiodicodelaenergia.comelperiodicodelaenergia.com

Greenvolt Group, through Greenvolt Power, has obtained a financing of 284 million euros for its wind project of 253.1 megawatts (MW) in Gurbanesti, east of Bucharest (Romania), reported the renewable group. Specifically, this financing has been structured with a consortium of eight financial institutions: UniCredit, Erste Group Bank AG, [...] The Greenvolt entry closes a financing of 284 million for a wind project of 253 MW in Romania appears fi…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Forbes España broke the news on Thursday, October 8, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal