Published • loading... • Updated
Green light for two road closures for up to 18 weeks at Lymm
Summary by Warrington Worldwide
1 Articles
1 Articles
Green light for two road closures for up to 18 weeks at Lymm
HIGHWAY planners have given the green light to two lots of road closures in Lymm village for up to 18 weeks to allow Scottish Power to install new HV Cables. It means at least two lots of eighteen week road closures will be running tandem in the village. Warrington Borough Council has now made an Order under Section 14 of the Road Traffic Regulation Act 1984. The effect of which will be to introduce a prohibition of driving as follows: Eagle Bro…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
