Greece’s IPTO Seeks Pay for Delays to €1.9 Billion Subsea Cable
Summary by Bloomberg
4 Articles
4 Articles
All
Left
1
Center
Right
2
Plans to build a cable connecting Cyprus and Israel to mainland Europe have been suspended, Bloomberg reports.
ADMIE seeks compensation over delays to €1.9 billion power link project
Greece’s power grid operator ADMIE is seeking compensation from Greek and Cypriot regulators over delays in receiving permits for crucial seabed surveys required to complete the €1.9 billion ($2.12 billion) Great Sea Interconnector (GSI), Bloomberg reported on Friday.
·Athens, Greece
Read Full ArticleCoverage Details
Total News Sources4
Leaning Left1Leaning Right2Center0Last UpdatedBias Distribution67% Right
Bias Distribution
- 67% of the sources lean Right
67% Right
L 33%
R 67%
Factuality
To view factuality data please Upgrade to Premium