Published • loading... • Updated
Grand Agadir: Tamelast Landfill Expanded to Build Landfill Capacity
Summary by leseco.ma
1 Articles
1 Articles
The only controlled landfill in the Grand Agadir is the 10.026 m2 extension of its second locker, a 2.61 MDH project aimed at increasing landfill capacity for more than 1.2 million inhabitants. The post Grand Agadir: the expanded Tamelast landfill to enhance landfill capacity appeared first on LesEco.ma.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium