Post-Flood Reconstruction to Cost Nepal an Estimated $4.74 Billion
8 Articles
8 Articles
Budget to rebuild infrastructure, the energy sector, the transport system and other impacts caused by the catastrophic flood in Nepal, exceeds 4 billion dollars.
Post-flood reconstruction to cost Nepal an estimated $4.74 billion
The estimated resource needs are based on the Rapid Damage and Needs Assessment (RDNA) report that has been prepared by a joint technical team comprising the National Planning Commission and the National Disaster Risk Reduction and Management Authority.
The devastating floods of 26 August have so far left more than 1,300 people dead and some 5,000 missing. Nepal will need about 5,000 mdd for reconstruction first appeared on Eleven News.
Nepal should open new doors for trilateral cooperation involving India and China towards climate sustainable development.
Post-flood reconstruction to cost Nepal an estimated NPR 723 billion
Digital Desk | Kathmandu, Sep 10 (IANS) An estimated NPR 723.315 billion ($4.74 billion) will be required for reconstruction and recovery following the deadly floods in Nepal’s Bhotekoshi River in Rasuwa district on August 26, the Prime Minister’s Secretariat said on Thursday. The estimated resource needs are based on a Rapid Damage and Needs Assessment (RDNA) report prepared by a joint technical team comprising the National Planning Commissio…
Coverage Details
Bias Distribution
- 50% of the sources lean Left, 50% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium










