General Dynamics Information Technology Leads $41M Battlefield Tech Upgrade From Beavercreek
6 Articles
6 Articles


General Dynamics Electric Boat awarded $1.85 billion contract modification for long lead time material and preliminary construction for submarine production
GROTON, Conn. , July 2, 2025 /PRNewswire/ -- General Dynamics Electric Boat, a business unit of General Dynamics (NYSE: GD), announced today that it was awarded a $1.85 billion contract modification to a previously awarded contract supporting submarine production. This…
General Dynamics Electric Boat Awarded $1.85 billion Contract Modification For Submarine Production
Electric Boat, a business unit of General Dynamics, announced that it was awarded a $1.85 billion contract modification to a previously awarded contract supporting submarine production. This modification is for long lead time material and preliminary construction efforts for submarine production…
General Dynamics Electric Boat gets $1.85B Virginia class contract mod
General Dynamics Electric Boat, a business unit of General Dynamics (NYSE: GD) reports that it was awarded a $1.85 billion contract modification to a previously awarded contract supporting submarine production. This modification is for long lead time material and preliminary construction efforts associated with Virginia-class Block VI submarines as detailed in the June 26 U.S. Department of Defense contract award announcement. “This contract …
Coverage Details
Bias Distribution
- 67% of the sources are Center
To view factuality data please Upgrade to Premium