First Gas Flows From Germany’s Third LNG Regasification Platform
4 Articles
4 Articles


First gas flows through Strohm’s pipeline in Germany
In a significant milestone for European energy security, first gas is flowing through Strohm’s Thermoplastic Composite Pipe (TCP) system at the Wilhelmshaven 2 terminal in Germany, following the successful commissioning of a second Floating Storage Regasification Unit (FSRU), Excelsior. This marks the first time gas is being delivered to Europe through this newly installed subsea pipeline infrastructure.
The gas storage systems in Germany are filled to 46 % instead of 77 % exactly twelve months ago. An overview of the quantity situation. The post gas storage systems in Germany are terrifyingly empty – what now? appeared first on financemarktwelt.de.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium