Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Plug Power Completes Installation of 100 MW GenEco Electrolyzer Units at Galp's Sines Refinery - Plug Power (NASDAQ:PLUG)

The electrolyzer system will produce up to 15,000 tons of renewable hydrogen annually, cutting 110,000 tons of CO2 emissions and replacing 20% of grey hydrogen use at the refinery.

  • Plug Power Inc. completed installation of 100MW of PEM GenEco electrolyzer arrays at Galp's Sines Refinery on Jan. 23, 2026, delivering all ten 10MW units.
  • Plug's strategic rollout in Europe includes the Sines project, projected to produce 15,000 tons per year, replace 20% of refinery grey hydrogen, and cut 110,000 tons CO2e annually.
  • Using modular PEM systems, Plug's GenEco electrolyzers were delivered via a global supply chain integrating components manufactured across the U.S. and Europe, the company said.
  • Near term, the project will move into commissioning, and Galp called the milestone a step toward producing green hydrogen at an industrial scale, 'With this pioneering project, Galp is closer to producing green hydrogen at an industrial scale, a historic moment for European refining,' said Ronald Doesburg.
  • Plug's global deployments show over 72,000 fuel cell systems and 275 fueling stations, with hydrogen plants operational in Georgia, Tennessee, and Louisiana producing 40 tons per day.
Insights by Ground AI

11 Articles

Lean Right

Galp says that when it starts, this "green hydrogen production unit will be Europe's biggest" with the ability to "produce up to 15,000 tonnes of renewable hydrogen per year".

·Portugal
Read Full Article
Lean Right

The petroleum is expected to start producing this green gas in the second half of 2026.

·Portugal
Read Full Article

Galp's green hydrogen project at the Sines Refinery is expected to become the largest in Europe, with an annual capacity of 15,000 tons. Galp has completed the installation of the tenth and final electrolyzer of the 100 MW green hydrogen project under development at the Sines Refinery, an undertaking that, when operational, is expected to become the largest unit of its kind in Europe. Operation is scheduled to begin in the second half of 2026. T…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 60% of the sources lean Right
60% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Jornal de Negócios broke the news in Porto, Portugal on Friday, January 23, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal