Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Fossils Are Collected During Transmission Line Work - 29/07/2026

Summary by Folha De S.Paulo
More than 2,600 samples of fossils were collected during the excavation to construct a line of transmitted energy between Paran and S o Paulo, according to paleont logos that followed the work to identify and collect the material. The measure a requirement of the license granted by Ibama (Instituto Brasileiro do Medio Ambiente e dos Ressources Naturais Renov ves).
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

More than 2,600 samples of fossils were collected during the excavation to construct a line of transmitted energy between Paran and S o Paulo, according to paleont logos that followed the work to identify and collect the material. The measure a requirement of the license granted by Ibama (Instituto Brasileiro do Medio Ambiente e dos Ressources Naturais Renov ves).

·São Paulo, Brazil
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Folha de S.Paulo broke the news in São Paulo, Brazil on Wednesday, July 29, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal